Where the survey stands

4 boundaries: 1 verified, 2 with open defects, 1 needing reassessment

  • Defects open2
  • Reassessment needed1
  • Verified1

16 items on the register: 7 satisfactory, 1 repaired and accepted, 6 open defects (1 urgent), 1 could not be assessed, 1 not surveyed yet

2 things need reassessment after an alteration.

On the planBoundaries and items, floor by floor
Plant roomStoreKitchenCorridorStair 1LiftlobbyLiftWCsReceptionStair 2EXITEXITEXITPlan of the ground floor
CW-G-01 · 60 min · VerifiedCW-G-02 · 60 min · Defects open
  • Defects open
  • Reassessment needed
  • Not fully inspected
  • Not surveyed
  • Verified
  • Satisfactory
  • Defect
  • Urgent defect
  • Could not assess
  • Not surveyed

Tap a boundary or an item to find it in the lists below. Every state is also written on the plan and in the lists.

Boundaries44 boundaries: 1 verified, 2 with open defects, 1 needing reassessment
  • CF-1-01 · Compartment floor

    First floor slab, between ground and first floor. Between ground floor and first floor

    Reassessment needed
    Required fire resistance
    60 min
    Design reference
    Fire strategy FS-02 rev C (fictional), drawing FS-101
    Floor
    First floor

    Outstanding (2)

    • CF-1-01: altered since it was surveyed, needs another look
    • SP-1-02: altered since it was surveyed, needs another look

    Sections

    • Open-plan officeInspected
    • Meeting roomInspected
    • Riser cupboardInspected
    • CorridorInspected

    Items (4)

    Add an item to CF-1-01

    Doors (0)

    • CW-1-01 · Compartment wall

      First, server room enclosure. Between server room and corridor, archive store and tea point

      Defects open
      Required fire resistance
      60 min
      Design reference
      Fire strategy FS-02 rev C (fictional), drawing FS-101
      Floor
      First floor

      Remedial works: 5, 1 accepted.Handover pack for CW-1-01

      Outstanding (11)

      • CB-1-01: open defect
      • SP-1-01: open defect
      • SP-1-04: open defect
      • SP-1-05: open defect
      • FD-1-03: open defect on the door
      • SP-1-04: rework required on the remedial work
      • SP-1-01: pre-cover check not recorded yet (hold point)
      • SP-1-01: open snags or actions on the remedial work
      • SP-1-04: open snags or actions on the remedial work
      • CB-1-01: work completed, awaiting verification
      • Tea point side: partly inspected. Ceiling void above the tea point seen from one tile only.

      Sections

      • Server room sideInspected
      • Corridor sideInspected
      • Archive store sideInspected
      • Tea point sidePartly inspected

      Doors (1)

    • CW-G-01 · Compartment wall

      Ground, Stair 1 enclosure. Between stair 1 and corridor and lift lobby

      Verified
      Required fire resistance
      60 min
      Design reference
      Fire strategy FS-02 rev C (fictional), drawing FS-101
      Floor
      Ground floor

      Verified: nothing outstanding

      Every section is inspected, every linked item is satisfactory, every linked door is signed and in date, and nothing has been altered since.

      Sections

      • Stair sideInspected
      • Corridor sideInspected
      • Lift lobby sideInspected

      Items (2)

      Add an item to CW-G-01

      Doors (1)

    • CW-G-02 · Compartment wall

      Ground, service riser enclosure. Between service riser and corridor, lift lobby and wcs

      Defects open
      Required fire resistance
      60 min
      Design reference
      Fire strategy FS-02 rev C (fictional), drawing FS-101
      Floor
      Ground floor

      Outstanding (4)

      • SP-G-02: open defect
      • SP-G-03: open defect
      • Inside the riser: inaccessible. Riser cupboard locked, no key on site. Key holder back Monday.
      • FD-G-07: door inspection overdue

      Sections

      • Corridor sideInspected
      • Lift lobby sideInspected
      • Inside the riserInaccessible
      • WC sideInspected

      Items (2)

      Add an item to CW-G-02

      Doors (1)

    Register16Every item, with filters

    16 items shown of 16.

    • SP-1-01Service penetrationUrgent defectContractor: In progressFirst, corridor, server room wall at high level
      Open the record for SP-1-01

      First floor · in CW-1-01

      Construction: Cable tray through 140 mm blockwork, about 200 by 100 mm opening

      Finding: Large unsealed opening round the cable tray, about 200 by 100 mm

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

      Remedial work with Northgate Doorsets · open

    • SP-1-03Service penetrationRepaired, work acceptedFirst, corridor, server room wall at high level
      Open the record for SP-1-03

      First floor · in CW-1-01

      Construction: Two 15 mm copper refrigerant pipes for the server room cooling

      Finding: Gap round both pipes filled with expanding foam only

      Signed by Priya Nair (Level 3 passive fire protection inspection), 22 Oct 2026

      Remedial work with Northgate Doorsets · accepted 24 Oct 2026

    • SP-G-02Service penetrationDefect, high priorityGround, corridor, riser wall at low level
      Open the record for SP-G-02

      Ground floor · in CW-G-02

      Construction: Two 110 mm plastic waste pipes through 140 mm blockwork

      Finding: No collars on two 110 mm plastic pipes; open gap round both

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

      Book remedial work on SP-G-02
    • CB-1-01Cavity barrierDefect, medium priorityContractor: CompletedVerification: Awaiting verificationFirst, tea point, ceiling void on the server room line
      Open the record for CB-1-01

      First floor · in CW-1-01

      Construction: Calcium silicate board cavity barrier

      Finding: Barrier board loose, gap of about 30 mm at the outside wall end

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

      Remedial work with Northgate Doorsets · open

    • SP-1-04Service penetrationDefect, medium priorityContractor: In progressVerification: Rework requiredFirst, archive store, server room wall at low level
      Open the record for SP-1-04

      First floor · in CW-1-01

      Construction: About 20 data cables in a 100 mm sleeve

      Finding: Sleeve not sealed at either end

      Signed by Priya Nair (Level 3 passive fire protection inspection), 22 Oct 2026

      Remedial work with Northgate Doorsets · open

    • SP-1-05Service penetrationDefect, low priorityContractor: BookedFirst, tea point, server room wall at low level
      Open the record for SP-1-05

      First floor · in CW-1-01

      Construction: Single 20 mm data cable

      Finding: Open gap of about 5 mm round the cable

      Signed by Priya Nair (Level 3 passive fire protection inspection), 22 Oct 2026

      Remedial work with Northgate Doorsets · open

    • SP-G-03Service penetrationDefect, low priorityGround, WCs, riser wall above the ceiling
      Open the record for SP-G-03

      Ground floor · in CW-G-02

      Construction: 100 mm steel ventilation duct, fire damper

      Finding: Damper access panel missing its fixing screws

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

      Book remedial work on SP-G-03
    • CB-G-01Cavity barrierCould not assessGround, reception, ceiling void on the WC line
      Open the record for CB-G-01

      Ground floor · not linked to a boundary

      Construction: Cavity barrier as drawn on the fire strategy (not seen)

      Finding: Ceiling tiles are fixed; the barrier could not be seen

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

    • LJ-1-01Linear jointSatisfactoryFirst, corridor, head of the server room wall
      Open the record for LJ-1-01

      First floor · in CW-1-01

      Construction: Head-of-wall joint, 15 mm, fire-rated sealant

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

    • LJ-1-02Linear jointSatisfactoryFirst, meeting room, slab edge at the outside wall
      Open the record for LJ-1-02

      First floor · in CF-1-01

      Construction: Slab edge seal, mineral wool and sealant

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

    • LJ-G-01Linear jointSatisfactoryGround, corridor, head of the Stair 1 wall
      Open the record for LJ-G-01

      Ground floor · in CW-G-01

      Construction: Head-of-wall joint, 20 mm, fire-rated sealant over mineral wool

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

    • SF-1-01Structural fire protectionSatisfactoryFirst, open-plan office, steel beam under the roof
      Open the record for SF-1-01

      First floor · in CF-1-01

      Construction: Steel beam, board encasement, 60 minute system

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

    • SF-G-01Structural fire protectionSatisfactoryGround, reception, steel column supporting the first floor
      Open the record for SF-G-01

      Ground floor · in CF-1-01

      Construction: Steel column, intumescent paint, 60 minute system

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

    • SP-1-02Service penetrationSatisfactoryNeeds reassessmentFirst, riser cupboard, floor
      Open the record for SP-1-02

      First floor · in CF-1-01

      Construction: Service bundle through the slab, batt and mastic seal

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

      Altered on 26 Oct 2026: New hole cored through the riser floor for a fibre cable, next to SP-1-02. Needs another look.

    • SP-G-01Service penetrationSatisfactoryGround, lift lobby, Stair 1 wall at high level
      Open the record for SP-G-01

      Ground floor · in CW-G-01

      Construction: Two data cables in a 25 mm sleeve, intumescent sealant

      Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026

    • SP-G-04Service penetrationNot surveyedGround, kitchen, corridor wall (from the fire-stopping schedule)
      Open the record for SP-G-04

      Ground floor · not linked to a boundary

      Construction: Gas pipe sleeve, as scheduled

      On the register from Sam Whitfield, 20 Oct 2026. Not surveyed yet.

    Rooms and what was inspected236 limitations

    Ground floor

    • Plant roomNot surveyedOutside this survey: the landlord surveys the plant room separately.Priya Nair, 21 Oct 2026
    • StoreNothing recorded
    • KitchenNothing recorded
    • CorridorInspectedPriya Nair, 21 Oct 2026
    • Stair 1InspectedPriya Nair, 21 Oct 2026
    • Lift lobbyInspectedPriya Nair, 21 Oct 2026
    • LiftNothing recorded
    • Service riserInaccessibleRiser cupboard locked, no key on site. Key holder back Monday.Priya Nair, 21 Oct 2026
    • WCsInspectedPriya Nair, 21 Oct 2026
    • ReceptionPartly inspectedCeiling void seen at two tiles only; the rest are fixed.Priya Nair, 21 Oct 2026
    • Stair 2Nothing recorded

    First floor

    • Archive storeInspectedPriya Nair, 21 Oct 2026
    • Server roomInspectedPriya Nair, 21 Oct 2026
    • Tea pointPartly inspectedCeiling void above the tea point seen from one tile only.Priya Nair, 21 Oct 2026
    • CorridorInspectedPriya Nair, 21 Oct 2026
    • Stair 1Nothing recorded
    • Lift lobbyNothing recorded
    • LiftNothing recorded
    • Riser cupboardInspectedPriya Nair, 21 Oct 2026
    • WCsNothing recorded
    • Open-plan officeInspectedPriya Nair, 21 Oct 2026
    • Meeting roomInspectedPriya Nair, 21 Oct 2026
    • Stair 2Nothing recorded
    Alterations1Flagged for reassessment
    • New hole cored through the riser floor for a fibre cable, next to SP-1-02

      First floor · Dan Ellis, 26 Oct 2026 · flags CF-1-01, SP-1-02 for reassessment

    More information

    Compartment walls and floors, service penetrations, joints, cavity barriers and structural fire protection, surveyed item by item. Doors keep their own record and are linked to the boundary they sit in.

    Doors and compartmentation are recorded separately. Doorledger gives no overall result for the building.

    Release 21.3 · build ede6557 · 16 Nov 2026