FD-1-03

Defect

Gap at the head 6 mm; the offices and shops guide gives 2-4 mm

FD60S · First, corridor to server room

Last signed inspection 14 Sep 2026, by Priya Nair

Next step

Who
Sam Whitfield, manager (you)
To do
Book a contractor
By when
No date set
No fix is booked for this defect yet.

Photos

No photos on FD-1-03 yet. Photos from inspections, faults, repairs and uploads all show here.

Inspect, check or report

  • Full inspection

    Signed, competent inspector

    The signed inspection by a competent inspector: 32 questions, evidence and the result.

    Signed by a competent inspector: Priya Nair.

  • Staff check

    Observation, not an inspection

    Seven quick questions by site staff. An observation, not an inspection.

    Do a staff check
  • Report a fault

    Report, not a defect

    Anyone on the building: what is wrong, a photo if you can, how urgent. The manager decides what happens. It is not a defect until then.

    Report a fault

Rating FD60S, installed 15 Feb 2021

First floor plan with FD-1-03 marked

None waiting on this door

Not signed in? Visitors see a shorter page and can report a fault.

See what a visitor sees