Release 21.3 · build ede6557 · 16 Nov 2026
Planning and reports
Cavity barrier · Ground, reception, ceiling void on the WC line
Hand tools only on frames. Do not drill, sand or cut the plant room door surround (FD-G-05): textured coating sample S3 contains asbestos. Stop and tell the manager if you find any material you are unsure of. For fire-stopping, cut out old sealant by hand: no power tools on wall linings.
From HH-AR-01, reviewed by Sam Whitfield
Dated 18 Aug 2025, by Thorne Environmental (fictional)
Not covered: Roof void; lift shaft
Not accessed: Service riser behind FD-G-07 (locked on the day)
1 photo from every inspection, fault, repair and upload, newest first. Tap one to see it full screen.
Full inspection
Signed, competent inspector
A survey finding signed by a competent surveyor.
Signed by a competent surveyor: Priya Nair.
Report a fault
Report, not a defect
Anyone on the building: what is wrong, a photo if you can, how urgent. The manager decides what happens. It is not a defect until then.
Report a faultCould not assess
Ceiling tiles are fixed; the barrier could not be seen
Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026
No remedial work booked.