Planning and reports
Service penetration · First, tea point, server room wall at low level
What you can do here
Held for review: Intrusive fire-stopping
It was booked as Not sure: nobody has settled whether it cuts, drills or disturbs the building fabric.
Who can release it: Sam Whitfield (BOHS P405 Management of asbestos in buildings) can review it and record Yes or No, with the reason.
Until then remedial work here cannot progress, record an installation or complete.
No asbestos found in the server room wall or its linings (samples S6 to S9). Do not open the ceiling over the open-plan office: it was not surveyed.
From HH-RS-02, reviewed by Sam Whitfield
Dated 20 Oct 2026, by Calloway Surveys Ltd (fictional)
Not covered: Server room floor void; above the suspended ceiling in the open-plan office
Not accessed: Riser cupboard (locked on the day)
Dated 15 Oct 2026, by Calloway Surveys Ltd (fictional)
Not covered: Above the suspended ceiling in the open-plan office
1 photo from every inspection, fault, repair and upload, newest first. Tap one to see it full screen.
Full inspection
Signed, competent inspector
A survey finding signed by a competent surveyor.
Signed by a competent surveyor: Priya Nair.
Report a fault
Report, not a defect
Anyone on the building: what is wrong, a photo if you can, how urgent. The manager decides what happens. It is not a defect until then.
Report a faultDefect, low priority
Open gap of about 5 mm round the cable
Signed by Priya Nair (Level 3 passive fire protection inspection), 22 Oct 2026