Planning and reports
Gap round both pipes filled with expanding foam only
Accepted and verified. Nothing is waiting on this work.
Completed is the contractor's word. Only a named verifier, never the contractor's firm, can accept the work.
In boundary CW-1-01, 60 minutes required
No asbestos found in the server room wall or its linings (samples S6 to S9). Do not open the ceiling over the open-plan office: it was not surveyed.
From HH-RS-02, reviewed by Sam Whitfield
Dated 20 Oct 2026, by Calloway Surveys Ltd (fictional)
Not covered: Server room floor void; above the suspended ceiling in the open-plan office
Not accessed: Riser cupboard (locked on the day)
Dated 15 Oct 2026, by Calloway Surveys Ltd (fictional)
Not covered: Above the suspended ceiling in the open-plan office
Will this work cut, drill or disturb the building fabric (walls, floors, ceilings, linings, frames or existing materials)?
No, as booked by Sam Whitfield on 22 Oct 2026
Booked as: No. The pipes go through an existing 60 mm hole; the foam is pulled out by hand and nothing is cut or drilled.
Signed as Sam Whitfield, BOHS P405 Management of asbestos in buildings.
Kept on the record and in the audit pack.
No hold point: this item stays visible when finished.
No differences from the specified detail in what was recorded.
| Measurement | Specified | As installed |
|---|---|---|
| Annular gap | 15 mm | 12 mm |
| Seal depth | 25 mm | 25 mm |
| Sleeve or wrap length | 50 mm | 50 mm |
Recorded by Dan Ellis, 23 Oct 2026
Dan Ellis, 23 Oct 2026: Foam removed, both pipes exposed
Dan Ellis, 23 Oct 2026: Wraps on, sealant going in
Dan Ellis, 23 Oct 2026
No works certificate on the record. The handover lists this as a limitation.
The installer's certificate is kept as evidence. It does not accept the work: only the named verifier does.
No snags or actions.
Completed by Dan Ellis, 23 Oct 2026
Accepted means a named verifier accepted the work as recorded. Doorledger does not certify fire resistance.