All jobs
To do5
- SP-1-04Rework requiredOverdue · Fire-stopping works · Northgate DoorsetsSeal both ends of the cable sleeve with intumescent plugs.
- Fire alarmBooked with Fernhill Alarm ServicesOverdue · Fire system service · Fernhill Alarm ServicesInspection and service
- SP-1-01In progressUrgent · Fire-stopping works · Northgate Doorsets · On holdSeal the opening round the cable tray with coated batt and mastic. The tray is then boxed in.
- FD-1-05Defect, fix bookedFirst, corridor to Stair 1 · Calder & Reeve JoineryIntumescent strip damaged at latch edge again
- SP-1-05BookedFire-stopping works · Northgate DoorsetsSeal round the data cable with intumescent sealant.
Awaiting verification2
- CB-1-01Awaiting verificationOverdue · Fire-stopping works · Northgate DoorsetsRe-fix the loose barrier board and seal the 30 mm gap at the outside wall.
- FD-G-05Defect, awaiting verificationGround, corridor to plant room · Northgate Doorsets · Proof 1 day after the repair dateGap at the head 6 mm; the offices and shops guide gives 2-4 mm
Verified and closed3
- FD-1-05ClosedFirst, corridor to Stair 1 · Calder & Reeve JoineryIntumescent strip damaged at latch edge
- FD-G-02ClosedGround, reception to kitchen · Northgate DoorsetsCloser does not latch the door from 90 degrees
- SP-1-03AcceptedFire-stopping works · Northgate DoorsetsRemove the foam. Wrap both pipes and seal with intumescent sealant to the specified detail.
Not booked yet5
Tick the repairs to book together with one contractor and one date.
- ExtinguishersOverdueOverdue · Fire system service · Not bookedExtended service or overhaul
- ExtinguishersDue soonFire system service · Not bookedAnnual basic service
- Emergency lightingNever doneFire system service · Not bookedAnnual full-duration test
- FD-1-03No fix bookedGap at the head 6 mm; the offices and shops guide gives 2-4 mm
- FD-G-06Urgent · No fix bookedHeld open by HO-G-02 when the fire alarm sounded at the weekly test
Time to review proof
Every contractor's jobs on this building. Open one for its door, its proof and who acts next.
Proof is verified by a person, never by the contractor.