Skip to content
Demo building. Its records are dated Tue 27 Oct 2026, the demo's fixed date. Buildings you add, and shared buildings, use today's date.

Good morning, Sam.

Tuesday, 27 October 2026

Today

Building survey

2 doors need surveying (2 never inspected)

Choose the contractor and the date; every door is in it. The contractor records the details at each door.

Harbour House at a glance

Needs you today

Urgent2

New urgent defect

FD-1-02

Fire door wedged open on an escape route

Raised this morning by Priya Nair · FSO 2005 art 17(1)

Urgent defect · open 6 days

FD-G-06

Held open by HO-G-02 when the fire alarm sounded at the weekly test

Raised 6 days ago by Jo Okafor · No fix booked

Overdue or due soon2

Fix going overdue

FD-1-05

Intumescent strip damaged at latch edge again

Raised 42 days ago by Priya Nair · Calder & Reeve Joinery

Open the job

Inspection overdue

FD-G-08

Annual inspection overdue

Was due Mon 12 Oct, 14 days over · Not a contractor job, so it is not in Jobs

Waiting on someone else1

Awaiting verification

FD-G-05

Gap at the head 6 mm; the offices and shops guide gives 2-4 mm

Waiting 6 days · Only Priya Nair, inspector can approve

FSO 2005 art 17(1); HM Government offices and shops guide, Appendix B2

Release 21.3 · build ede6557 · 16 Nov 2026