SP-G-02 Service penetration
No accepted quote for this finding yet. Contractors can quote it from their quotes page; or enter the agreed price.
The firm must hold an in-date, verified fire-stopping installation certification (provisional, awaiting validation).
Seen by you and the booked firm only.
Only this person, or you, can accept the work or ask for rework. Never the contractor's firm.
The boundary needs 60 minutes' fire resistance (design record).
Ground, corridor, riser wall at low level
Defect, high priority No collars on two 110 mm plastic pipes; open gap round both
Found by Priya Nair, Level 3 passive fire protection inspection. The work joins a programme alongside door replacements.