Linear joint · First, corridor, head of the server room wall
Nothing is waiting on this item.
No asbestos found in the server room wall or its linings (samples S6 to S9). Do not open the ceiling over the open-plan office: it was not surveyed.
From HH-RS-02, reviewed by Sam Whitfield
Dated 20 Oct 2026, by Calloway Surveys Ltd (fictional)
Not covered: Server room floor void; above the suspended ceiling in the open-plan office
Not accessed: Riser cupboard (locked on the day)
Dated 15 Oct 2026, by Calloway Surveys Ltd (fictional)
Not covered: Above the suspended ceiling in the open-plan office
1 photo from every inspection, fault, repair and upload, newest first. Tap one to see it full screen.
Full inspection
Signed, competent inspector
A survey finding signed by a competent surveyor.
Signed by a competent surveyor: Priya Nair.
Report a fault
Report, not a defect
Anyone on the building: what is wrong, a photo if you can, how urgent. The manager decides what happens. It is not a defect until then.
Report a faultSatisfactory
Signed by Priya Nair (Level 3 passive fire protection inspection), 21 Oct 2026
No remedial work booked.