Release 21.3 · build ede6557 · 16 Nov 2026
Planning and reports
Open gap of about 5 mm round the cable
Still needed
3 still needed before it can be marked complete.
Completed is the contractor's word. Only a named verifier, never the contractor's firm, can accept the work.
In boundary CW-1-01, 60 minutes required
Held for review: Intrusive fire-stopping, works wk-seed-05
It was booked as Not sure: nobody has settled whether it cuts, drills or disturbs the building fabric.
Who can release it: Sam Whitfield (BOHS P405 Management of asbestos in buildings) can review it and record Yes or No, with the reason.
Until then the contractor cannot record progress, an installation or completion, and the work cannot be accepted. Photos, checks and snags can still be recorded.
No asbestos found in the server room wall or its linings (samples S6 to S9). Do not open the ceiling over the open-plan office: it was not surveyed.
From HH-RS-02, reviewed by Sam Whitfield
Dated 20 Oct 2026, by Calloway Surveys Ltd (fictional)
Not covered: Server room floor void; above the suspended ceiling in the open-plan office
Not accessed: Riser cupboard (locked on the day)
Dated 15 Oct 2026, by Calloway Surveys Ltd (fictional)
Not covered: Above the suspended ceiling in the open-plan office
Will this work cut, drill or disturb the building fabric (walls, floors, ceilings, linings, frames or existing materials)?
Held for review, as booked by Sam Whitfield on 22 Oct 2026
Booked as: Not sure. The old sealant may need cutting out of the lining; to be checked before work starts.
Signed as Sam Whitfield, BOHS P405 Management of asbestos in buildings.
Kept on the record and in the audit pack.
No hold point: this item stays visible when finished.
No installation record yet. The contractor records the specified system and what was actually built.
For example EI 60
What the wall or floor is actually built of
Saying yes adds a hold point. A hold point set at booking cannot be removed.
None yet. The opening or joint as found, before any work.
None yet. The work part done: collars, batts, backing and seal depth visible.
None yet. The finished seal or barrier.
Opening the camera…
Photos are saved on this device.
No works certificate yet. The installer adds it once the installation is recorded.
The installer's certificate is kept as evidence. It does not accept the work: only the named verifier does.
Record the installation first: the certificate goes with it.
No snags or actions.
Not completed yet