Release 21.3 · build ede6557 · 16 Nov 2026
Planning and reports
Emergency lighting · Emergency light · Ground, reception by the main entrance
1 photo from every inspection, fault, repair and upload, newest first. Tap one to see it full screen.
Full inspection
Signed, competent inspector
A test or service signed by a competent person, on the system's own form.
A competent inspector, or the firm the manager books, records the annual full-duration test.
Staff check
Observation, not an inspection
The routine user test by the responsible person. Not a service.
Record the user testReport a fault
Report, not a defect
Anyone on the building: what is wrong, a photo if you can, how urgent. The manager decides what happens. It is not a defect until then.
Report a faultUrgent defect: Did not light on simulated mains failure
Raised 23 Oct 2026 by Jo Okafor. Open until a later test of the same check finds no defect.
Defect: Charge indicator not lit after the test
Raised 23 Oct 2026 by Jo Okafor. Open until a later test of the same check finds no defect.