FD-G-02FD30SReplacement of FD-G-02
Ground, reception to kitchen
Next step
- Status
- Surveyed
- Who
- Priya Nair, inspector
- To do
- Record the door required
- Target date
- No date set
What you can do here
Book a contractor below, then move the door on.
- Stage 1 of 6, Surveyed, current
- Stage 2 of 6, Specified, to come
- Stage 3 of 6, Ordered, to come
- Stage 4 of 6, Fitted, to come
- Stage 5 of 6, Certified, to come
- Stage 6 of 6, Signed off, to come
Before work starts
Held: Replacement, Doors with repeat defects
The information covering FD-G-02 is not reviewed for replacement. HH-AR-01 (asbestos register): Restrictions apply, but not for replacement.
Who can release it: Sam Whitfield (BOHS P405 Management of asbestos in buildings) can review it for replacement.
Until then the contractor cannot start, send proof or mark the door fitted.
Restrictions
Hand tools only on frames. Do not drill, sand or cut the plant room door surround (FD-G-05): textured coating sample S3 contains asbestos. Stop and tell the manager if you find any material you are unsure of. For fire-stopping, cut out old sealant by hand: no power tools on wall linings.
From HH-AR-01, reviewed by Sam Whitfield
- Asbestos registerHH-AR-01 v2Restrictions apply
Dated 18 Aug 2025, by Thorne Environmental (fictional)
Not covered: Roof void; lift shaft
Not accessed: Service riser behind FD-G-07 (locked on the day)
Plan
No contractor yet
Will this work cut, drill or disturb the building fabric? Yes. Replacing a doorset always takes out the old frame, so fitting waits for pre-work information covering this door to be reviewed for replacement.
Leave blank to use the example rates.