FD-1-05FD30SReplacement of FD-1-05
First, corridor to Stair 1
Next step
- Status
- Specified
- Who
- Sam Whitfield, manager (you)
- To do
- Book a contractor, then order the doorset
- Target date
- No date set
Before ordering:
- 11 details of the door required are still to capture: door type, internal or external, construction or material, frame width, frame height, leaf width, leaf height, smoke control, source document or reference, hold-open or access control, photo of the opening.
- No contractor is booked to fit it. Choose one in the plan below.
- Stage 1 of 6, Surveyed, done
- Stage 2 of 6, Specified, current
- Stage 3 of 6, Ordered, to come
- Stage 4 of 6, Fitted, to come
- Stage 5 of 6, Certified, to come
- Stage 6 of 6, Signed off, to come
Specified 23 Oct 2026, 10:01, recorded by Priya Nair
Before work starts
Held: Replacement, Doors with repeat defects
The information covering FD-1-05 is not reviewed for replacement. HH-MS-02 (asbestos management survey): Not reviewed.
Who can release it: Sam Whitfield (BOHS P405 Management of asbestos in buildings) can review it for replacement.
Until then the contractor cannot start, send proof or mark the door fitted.
- Asbestos management surveyHH-MS-02 v1Not reviewed
Dated 20 Oct 2026, by Calloway Surveys Ltd (fictional)
Not covered: Server room floor void; above the suspended ceiling in the open-plan office
Not accessed: Riser cupboard (locked on the day)
Plan
No contractor yet
Will this work cut, drill or disturb the building fabric? Yes. Replacing a doorset always takes out the old frame, so fitting waits for pre-work information covering this door to be reviewed for replacement.
Leave blank to use the example rates.