FD-G-05
Awaiting verification
FD60S · Ground, corridor to plant room
Last signed inspection 14 Sep 2026, by Priya Nair
- Decision waitingProof waiting for Priya Nair to reviewOnly the named reviewer can approve it.
- Work restrictionRestrictions from HH-AR-01Hand tools only on frames. Do not drill, sand or cut the plant room door surround (FD-G-05): textured coating sample S3 contains asbestos. Stop and tell the manager if you find any material you are unsure of. For fire-stopping, cut out old sealant by hand: no power tools on wall linings.
Next step
- Status
- Awaiting verification
- Who
- Priya Nair, inspector
- To do
- Verify the proof photos and close the defect
- Review due
- Due today, Tue 27 Oct
What you can do here
Photos (1)
1 photo from every inspection, fault, repair and upload, newest first. Tap one to see it full screen.
- 20 Oct 2026Door re-hung, head gap now about 3 mm
Inspect, check or report
Full inspection
Signed, competent inspector
The signed inspection by a competent inspector: 32 questions, evidence and the result.
Signed by a competent inspector: Priya Nair.
Staff check
Observation, not an inspection
Seven quick questions by site staff. An observation, not an inspection.
Do a staff checkReport a fault
Report, not a defect
Anyone on the building: what is wrong, a photo if you can, how urgent. The manager decides what happens. It is not a defect until then.
Report a fault
Rating FD60S, installed 3 Jun 2019
- Rating on record
- FD60S
- Leaf width
- 1.0 m
- Installed
- 3 Jun 2019
- Installed by
- Northgate Doorsets
- Next due
- 14 Sep 2027
- Open items
- 1
Why it is a fire door: Plant room (special fire hazard).
Ground floor plan with FD-G-05 marked
Where this plan came from
- Demo layout, made for this demo. It is not taken from a site drawing or survey.
1 open drawing or note on this floor. Drawings and notes on this floor are on the building plan. See drawings and notes
1 waiting for a person. Not signed, not counted.
Ledger Assist suggestion — draft until a person reviews it. Not signed, not counted.
Proof photo check
Looks improved, measure to confirm: the contractor's after photo shows a smaller gap at the head than the before photo. A person must measure it with a gauge. Ledger Assist has not closed anything.
Medium: Looks like a match, but only a person can say.
Not counted until a person adopts it.
Read only. An inspector reviews drafts.
Work on FD-G-05
Before work starts
Restrictions
Hand tools only on frames. Do not drill, sand or cut the plant room door surround (FD-G-05): textured coating sample S3 contains asbestos. Stop and tell the manager if you find any material you are unsure of. For fire-stopping, cut out old sealant by hand: no power tools on wall linings.
From HH-AR-01, reviewed by Sam Whitfield
- Asbestos registerHH-AR-01 v2Restrictions apply
Dated 18 Aug 2025, by Thorne Environmental (fictional)
Not covered: Roof void; lift shaft
Not accessed: Service riser behind FD-G-07 (locked on the day)
Door repairDefect, awaiting verification
Gap at the head 6 mm; the offices and shops guide gives 2-4 mm
FSO 2005 art 17(1); HM Government offices and shops guide, Appendix B2
- Contractor
- Northgate Doorsets
- Kind of work
- Adjustment or easing
- Fix booked for
- Mon 19 Oct
- Named reviewer
- Priya Nair, inspector
- Review due
- Tue 27 Oct
Awaiting verification
Proof sent by Northgate Doorsets. Priya Nair will verify it by 27 Oct 2026. The fix is done and its proof is awaiting verification. The defect stays open until it is signed off. Repair due 19 Oct. Proof sent 20 Oct, 1 day after the due date.
Work done, as the contractor describes it
- Adjusted the door to close the gaps
Priya Nair is the named reviewer for this fix, so only they can approve the proof.
Open the jobChange the reviewer
Named now: Priya Nair, inspector. Only the named reviewer can approve it.
How this fix workseach step, who does it and when
- Step 1 of 5, Defect, done
Defect
- Step 2 of 5, Quote, skipped, no quote needed
Quote
Skipped: no quote needed
- Step 3 of 5, Job, done
Job
- Step 4 of 5, Proof sent, done
Proof sent
- Step 5 of 5, Awaiting verification, current
Awaiting verification
Waiting on: Priya Nair to verify the proof, by 27 Oct 2026
Works programme
Plan a replacementHistory
Every change to this door's record: who did what, and when. Newest first.
All changes in this buildingLedger Assist suggestion
Ledger Assist suggestion: Proof photo check
By Ledger Assist (recorded demo run)
Observation
Proof submitted for verification. Work done: Adjusted the door to close the gaps. Door re-hung, head gap now about 3 mm
By Dan Ellis
Observation
Job booked for 19 Oct 2026. Priya Nair verifies the proof by 27 Oct 2026
By Sam Whitfield
Inspection record
Defect raised: Gap at the head 6 mm; the offices and shops guide gives 2-4 mm
By Priya Nair
Signed
Inspection by Priya Nair: defect
By Priya Nair
Signed
Inspection by Priya Nair: signed, no defect found
By Priya Nair
Observation
Installed 3 Jun 2019 by Northgate Doorsets
By Sam Whitfield