Release 21.3 · build ede6557 · 16 Nov 2026
Planning and reports
Draw it from the fire strategy or drawings.
From the fire strategy or design. Doorledger records it; it does not work it out.
The floor below.
This floor.
Where the requirement comes from, e.g. Fire strategy FS-02 rev C, drawing FS-101.
Each section is inspected on its own, seen from one room. Coverage recorded for that room counts for the section.
Suggested from the type and floor, e.g. CW-G-01. Each reference is used once.